what is the ratio of steel and concrete to use in slabs ,
beams, columns ?
Answer Posted / prashanth
For Slab-arround 75 kgs/Cum steel will consume.
ie Vol=Mass/Density
=75/7850
= .0095
For one Cum includes (Concrete and Steel)
ie =1-.0095
=.99 (Concrete)
Then ratio=.0095/.99
=.00955 X 100
=.95 (Ratio between concrete and steel)
For Beam-arround 130 kgs/Cum steel will consume.
ie Vol=Mass/Density
=130/7850
= .0165
For one Cum includes (Concrete and Steel)
ie =1-.0165
=.983 (Concrete)
Then ratio=.0165/.983
=.0167 X 100
=1.67 (Ratio between concrete and steel)
For Beam-arround 150 kgs/Cum steel will consume.
ie Vol=Mass/Density
=150/7850
= .0191
For one Cum includes (Concrete and Steel)
ie =1-.0165
=.98 (Concrete)
Then ratio=.0191/.98
=.0194 X 100
=1.94 (Ratio between concrete and steel)
| Is This Answer Correct ? | 98 Yes | 24 No |
Post New Answer View All Answers
Hi all, please guide me about the volume. And percentage. Of steel fibre to be used. My project. Is Sifcon.
I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
What is kn measurement?
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
What is a kip?
for 200 kg of cement how is the mix proportion in kg for m25 grade of concrete
how to calculate the scour depth
In Rcc ratio calculation I wanted to know quantity of Steel also.
what will happen if one could not properly follow the spacing of slab reinforcement bar?
what is meant by shear center?????
what is meant by residual strain?
What is meant by Crystal Concrete?
acceptance criteria for concrete works
How much for the BRC lapping in full yield and half yield < and which table to get it ?
what should be RCC material i.e iron rod(mm)x cement x stone x sand for laying of slab L 42'x B 22'x tk 0.375ft = 1nos & column of H 17'x15"x8" 2nos.