Answer Posted / prashanth
non pressure-3
| Is This Answer Correct ? | 8 Yes | 1 No |
Post New Answer View All Answers
What is a projection line?
it is possiblee to produce concrete with out cracks...
give me the mix proportion for design mix concrete M 7.5 grade 1:4:8
natucher of concrete &type of concrete?
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
Define What is the origin of name Railway Sleepers?
How to calculate the load of partion in flat slab if we use brick?
what is work of planning deptt. in any construction compny (in road project)
Why are steel plates inserted inside bearings in elastomeric bearings?
how can i calculate cement in brickwork
Is it possible to make a feature using an overdefined sketch?
at which depth the construction of tunnel is economical from cost and engineering aspect.
Stringer How many cm goes to landind
what post do you prefer to work in this company and why do you think you can serve better in such position?