adspace


how much quantity of cement bags are required to fill the
one m3 of empty container.?

Answer Posted / dinesh

30 BAGS R REQUIRED

Is This Answer Correct ?    4 Yes 6 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the difference between replacement of cement by groundnut shell ash

3308


hi, i am appearing in HPCL(CIVIL ENGG.)exam. plz send me placement paper of this exam if u are having

2601


cud any one send me tech quest paper(civil engg) at tarizus@yahoo.com

2264


manhole chamber having height of 2300 mm and thickness of brickwork is 230 mm and dia of opening covering is 560 mm and bottom length vertical is 1500 mm (1:4) brick masonry and plaster 12 mm on both sides..how to estimate the no bricks used with mortar cement bags and sand for total chamber including plaster.

1842


How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?

1618


water leak detection system question & answer

2527


can i get civil engineering test papers.......?????

2550


What is Density of cement, sand & aggregate ?

1615


kindly mail me by attaching files , formats for quality checks of common building materials like cement , concrete , bricks , sand and aggregates plz send my email id- VMANDAL91@gmail.com

1923


PLS.......... ANY ONE CAN FORWARD ME PREVIOUS QUESTION PAPER hpcl civil engg

2425


pls mail some more tecnical qustions at msaranya2610@gmail.com

2183


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2237


pls send me interview question paper with answer of EIL/AAI/UPSC/RPSC because i am doing prepration of compitation exam of UPSC for the Asst. Executive Engineer

3239


VAT and CST ? Which benefits for buyer ? Why benefits?

1905


400 ku d/c clearess ketan hota hai?

2124