while doing floring in a room,from where one can start
laying tiles.
Answer Posted / satyaveer singh
from free end corner of the room.
| Is This Answer Correct ? | 0 Yes | 5 No |
Post New Answer View All Answers
What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.
what is tension footing?
what is the clear cover for shearwall?
what is thumb rule for calculating the size of ISMB required for a particular length of span
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
How is make concrete cube?
Who designed the city of washington dc?
how much need sand and cement for 1 cft roof construction?
cement, sand, aggregate,reinforcement & concrete consumption per square feet in multi storeyed building
Define a polyline?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
Are you ready to relocate with your immediate family to United States as a new employee?
what is the ingredient value of 40mm and 20mm aggregates?
2. What are the advantages of your present job, things you like about it?
What Reinforcements Are Used In The Process Of Prestressing?