Answer Posted / sarfraz
1:0.75:1.5
| Is This Answer Correct ? | 6 Yes | 7 No |
Post New Answer View All Answers
water leak detection system question & answer
why top layer of block work shoud be full size if any cut block adjustable than another layer?
a butt weld is specified by
what could be the production cost of 1 cum of concrete by CP30 plant
what is the list of building construction equipment & teir output?
sir please send me campus placement questions in civil engineering
What is pre-stressed concrete?
How to calculate 1 brss for RCC work
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
How much cum. Brick work can do by 1 madon
trapozidal
What happens when water mixed with cowdung is used for priming instead of water for lifting water in pumps?
How and where are aqueducts built?
How reactor of SBR installed , is it be over ground, fully under ground or semi sunk ?