Please tell me how to calculate the stiruup length for
rectangular and circular coloumns
Answer Posted / suresh
suppose the size of the coloumn is 300*400. end and side
cover is 40.
therefore a=300-40=260
b=400-40=360
therefore L=a+b+9(dia of the bar)
=260+360+9(12)=728mm
Is This Answer Correct ? | 9 Yes | 25 No |
Post New Answer View All Answers
design the irrigation canal(b,B,h )head is 3tms of water is supplied to the 200hectars of area and the base period crop is 150days dance to water travels as 35km.the canal section is trapezoidal and also calculate the slop the canal
What are advancements in civil engineering?
Can inverted beams used in pipes during construction? If yes, explain how it can be implemented?
How to make tiles floor step by step procedure?
how much to get of BRC lapping in full yield and half yield ?
What is the sugested procedure of water purification for public supply?
What does civil engineering mean?
Can anyone suggest how to determine scheduling of reinforcement of floor beams from Staad model,other than clicking each beam respectively 7 noting down the values ?
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
Why is the use of granular sub-base in concrete carriageways not preferred, explain?
how to calculate steel for slab or footings?
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
How to construct a water sump in a rocky soil?
1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.
Please let me know about answer for my Question as "What is the maximum wastage allowable of HYSD Steel in any Bridge project as per Code and Code reference also ?