Answer Posted / parag
approximately 12.5 kgs per Mt for reiforcement and
shuttering work
Is This Answer Correct ? | 0 Yes | 7 No |
Post New Answer View All Answers
how to create our resume?
how much st. steel is required for staging of concourse slab of a elevated metro station allowing through traffic .
What is kn measurement?
What is Rankine Cycle?
Is there the dry coefficient of cement is constant?
How its coming concrete grade M 20 means 1:2:4. how it coming 1:2:4.
What is the difference between Hinged and pinned in Column ends
GIVE US YOUR FULL DETAIL OF THE FOLLOWING… FULL NAME.. PERMENENT MAILING ADDRESS DIRECT CONTACT NO E MAIL ADDRES.
I want to change job.If You have any vacancy please contact me in this mail id-parthamitra086@gmail.com.Myself partha mitra.Diploma in civil engineer with 4+ yrs. exp.Now in kolkata.If you confirm me then I will send my detail resume to you.Also send your mail id to me.My mail id is-parthamitra086@gmail.com.I will be very much thankful to you.
how can we construct building without foundation providing only grade beam at ground level
What is the material consumption- cement,sand,tiles etc for Toilet dado?
what is that one cub metre plaster in cemant and fine sand
what is the design procedure for building
What is the difference between tor steel and tmt steel?
how to calculate the size of triangular ring in rcc column?