What should be percentage of silt content in sand?
Answer Posted / naresh kumar n
AS PER IS:383-1970 THE SILT CONTENT SHOULD BE MAX 3% FOR
UNCRUSHED SAND i.e, RIVER SAND AND MAX 15% FOR CRUSHED SAND
i.e, CRUSHED STONE SAND.
| Is This Answer Correct ? | 53 Yes | 8 No |
Post New Answer View All Answers
please what is the number of bars required for a column of 6mx6m and 450mmx300mm,its a commercial building (Church)
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
(Project Management Topic) What are the important criteria in the successful realization of the project?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
Test procedure of fly ash bricks as per code ?
what r the precaution for high in atp tempareture,low in atp tempareture
what is cross hair cursor?
what discoveries did you have in relation to your course?
Why do you want to work here
Design a cantilever slab to carry a live load of 2000 N/m2. The overhang of the slab is 1.20m. b) A slab over a room is 4.75m x 4.75m. The edges of the slab are simply supported and the corners are not held down. The live load an the slab is 300 Kg/m2. The slab has a bearing of 15cm. On the supporting walls. Design the slab as per Rankine - Grashoff theory. Assume weight of R.C.C. = 2400 Kg/m2.
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
What is the diameter of the 3"inch nails?
what is the effect of duration of earth quake on framed structures ?
How many litres of water used for curing of 1000sqft of slav
IS STEEL BARS IS AS PER ISI TRANSVERSE RIBS SHOULD BE UNIFORM IN DISTANCE, PLEASE EXPLAIN WHY,