in the footings first which reinforcement bar has to be
layed as per design criteria.
Answer Posted / abid hussain
shorter span reinforcement should be placed first
Is This Answer Correct ? | 6 Yes | 4 No |
Post New Answer View All Answers
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)
PCC Road Min Grade M 30 for VR standard Mahatashtra load 30 KN. what should be thickness of pavement, width 4m what should be length of panel.
crank types
Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No. Loading Axial force Moment Shear 1 DL+LL 1950 600 20 2 Seismic load 250 4800 700
Define What is the best type of wood glue?
What are the advantages of cad software’s?
What is the use of extend command?
please what are the required bars for a beams of 6mx6m and 450x300mm, one is continuous and the the second is discontinuous ..Its a commercial building (church)
What the advantages and disadvantage of using 90mm and 100mm bricks for a wall of a house? Thanks for any input.
What is min thickness,min grade of conc & age of PQC ?
What do you understand by “preset” during the installation process of bridge bearings?
Doul Bar reinforcement and details of drawing.
List out the types of roofs?
how many running meters in one kilogram of 4mm pvc coated chainlink fencing
How to find coloumn vertical cut length floor to floor & lap + bend or anything plz clearfiy