Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to do risk management?

Answer Posted / mercy

Risk management is done to minimize the frequency of the
risk and also the impact assosciated with the risk.

2 activities assosciated with risk management are:

1. Risk reduction methods
2. Contingency Planning

1. Risk Reduction methods: As risk is frequency multiplied
by loss assosciated with the risk, to reduce risk we must
reduce both the risk and also the impact of the loss.

Loss = Frequency of loss * Loss per occurence

Frequency of loss can be reduced by reduce opportunity of
an error and Identify error prior to loss.

Using a web site example, you could reduce the opportunity
for customers to leave the web site by
designing the web site so that any customer need can be
identified in “three clicks” or less. To
implement the other means, to identify the error prior to
loss, you could track a customer as they
move through the web site to determine if they are making
too many clicks. If they make too
many, transfer the customer to a web site operator who
could correctly assist the customer.

Loss per occurence can be mimimized by minimize loss and
recover loss.

The loss per occurrence associated with an unfavorable
event can likewise be reduced in two
ways. The loss can be minimized, or an attempt can be made
to recover the loss. Offering a
customer the opportunity to talk directly to an individual
might minimize the potential loss. If the
customer’s e-mail address can be captured, a follow-up
message could go to the customer in an
attempt to reestablish the relationship with that customer,
and thus, recovering the loss of a sale.

Contingency planning: This is like a back up plan drafted
when an unfavourable event happens to continue business
operations.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

1. what is a date guidelines ?

2194


A defect which could have been removed during the initial stage is removed in a later stage. How does this affect cost?

1475


how deployment phase of SDLC differs in product based and in service based company ?

2960


Explain Test Plan with example? Explain following in the test plan with examples What is being tested? What are pass/fail criteria? When will each test occur? What Hardware & Software environment is required? What features must be tested? What features will not be tested? What are the responsibilities of individuals & organisation in the project?

2656


What is state transition?

1241


Why we have to do manual testing?

1688


HI FRNDS, I HAVE 2.5 years OF exp In Manual Testing,Plz let me know if thr r any oppurtunities in any company in Bangalore ID:dsnithi@gmail.com Thanks in Advance

2165


State a generalized process for load test? Or explain how you did it previously.

2541


I have 6 months experience as project tarine and one and a half year experience as software engineer.Should i write taht my total experience id 2 years.

1947


what is the challenging position faced in the testing not in point of management point of view it must be in the point of while testing the application?

4954


what is the common in all s.o.p (standaed operating procedure)?

1982


why use caffine for HPLC calibration ?

2154


Difference between Re-testing and Regression testing?

1223


Scenario-based testing Option 1 concentrates on actor and software interaction Option 2 misses errors in specifications Option 3 misses errors in subsystem interactions Option 4 Both 1 abd 2

3514


I am having 2 years of experience in Manual Testing, 2marrow I have an interview with a Company. Which type of questions they will ask me?How should I prepare for interview?Please guide me so that I will clear the interview.

2193