Answer Posted / santhosh k.m
Minimum Phase to earth clearence is 138cm, minimum phase
phase to phase is 160 cm , and highest system voltage is
145kV.
Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
In India the supply voltage is 230 volt A.C. During the negative half cycle phase becomes neutral and neutral become phase? or what will happen during negative half cycle? how the electrons flow during positive and negative half cycle?
Details about Flux Compensated magnetic Amplifer starter for motors
Why we find the sensitivity for the CT's to check?
DC transmission
how indusrial diesel generator work
This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.
What is the difference between a fuse and a breaker?
What do you mean by a current transformer?
why we use circuit breakers for switching instead of normal switching device?
i have faced a problem in ro plant grunfos make bm30type pump it is 22kw pump. We start this pump using siemens 3rw 4423-ibc44, 30kw softstarter but this soft starter will frequently failier so we planed to change dol starter. So pls tell anybudy its possible or not.
any application of back emf
How to calculate the Efficiency of Chiller
how we can do the insulation on secondary of ct explain and so that tan delta will within limit
how to calculate compresor capacity?
How we can calculate the consumption in kwh of motor on basis of kw @100% load, @50% load & @ no load.