in the footings first which reinforcement bar has to be
layed as per design criteria.
Answer Posted / sivalingam
Shorter span reinforcement should be placed first
| Is This Answer Correct ? | 8 Yes | 8 No |
Post New Answer View All Answers
List out the types of roofs?
What is the difference between shear and tensile strength?
types of piles detail,
what is the ingredient value of 40mm and 20mm aggregates?
how to calculate cost of raw materials of a building for 1000 sqft & also consolidated cost of labour in a 1000 sqft building
hi every body..i have applied for RRB section engineers CIVIL.i wanna prepare for that,so can any one suggest me some books and where can i get the syllabus for this..i would be vry greatful if any one can help in this regard
how many re use can use shutting material. timber ? ply? steel? plastic? fibre? aluminium? Doka?
1:4:8 pcc calculation 591 cu.ft
What is the difference between absorption & adsorption and sorption?
what is Quantity of stone and sand required for one cubic meter of stone work (UCR)
What is portland cement
how pumping of concrete effects the quantity of material used in it?
Please send me the qunty. of mason/labour required in each day for different type of civil construction work?please send me ans. in my mail.my mail id is (parthamitra086@gmail.com) or here.
we have a crushing plant and our product is experiencing flakiness and elongation over limit for granite. what is the solution to this problem? how can it be avoided and what to do differently? It is not ok for batching plants
I Want To Know Quantity of Cement Conc. & Sand in Column of 9"x9"x10'