how much cement is consumed by a stone masonry wall 17.7m long,0.55m wide and 1m high
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
whats is difference between anchorage length and development length
What Are The Different Type Of Slump Test Indications?
I need old MMUP exam question and answer for Civil engineering
What are the different softwares used for cad?
How to estabilish reinforcement Steel rolling margin for a building projects ?
WHAT IS THE % OF CONCRETE WASTAGES PERMITED IN A LARGE PROJECT ? AND WHICH IS CODE TO BE REFERED.
What is progress payment?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
What is the procedure of concealed plumbing in toilets?
"how can we find the approximate quantity of materials using in a building or total Expenditure in percentage for rough estimate after known the construction area(sqm)".please if you know something about that please post the answer.
How will be cutting in timber plate size 600*400 column size
How to do bbs in excel format