HOW TO FIND OUT THE QUANTITY OF CONCREATE
Answer Posted / suresh
QUANTITY OF CONCRETE=LENGTH OF STRUCTURE*WIDTH OF
STRUCTURE*THICKNESS OR DEPTH OF STRUCTURE
L*B*D=VOLUME
Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
calculate the quantity of cement ,sand,bars and aggregate used for 28*4 ft with 4 inch (125mm) thick
What is the primary difference between adsorption and absorption?
How Can I know the wastages(%) of each work added in estimating the quantity of construction materials?(Eg. Ceiling Work, Brick Work,etc....)
What is type failure of road surface? how to repair the failure of road surface?
what is the difference between tsp & tower
How to calculate or what is the process of calculation for making 1Metre squre area by AAC Blok which quantity of Cement, Sand & Chips are to be required?
The mixture of different ingredients of cement is burnt at?
what is cement wastage percentage in NHAI ROAD WORKS
by which materials we can prepare circular shuttering with tentative cost of material(rate analysis)
Why are steel plates inserted inside bearings in elastomeric bearing?
In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?
why should we use 20mm graded metal only in vrcc?why we shouldnot use 40mm metal?
How to calculate concrete in percentage wise ,for example cement 18% sand 40% aggregate 40% and Stell 2% ,I need and??
How to find the cuplock pipe qty in staging for Minor bridge?
mix design procedure for 1:6 cement mortar