Pls provide me with the calculation or codes related to de-
shuttering of flat slabs
Answer Posted / soumen
IS 4990 for concrete shuttering
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
Elaborate advantages & disadvantages of using crusher dust instead of sand in rcc work.
What are the main reasons for conducting pull-out tests for soil nails?
which is the cheapest type of flooring (say for using for 6 months in a factory building & dismantling it)?
Can rice husk ash be used instead of coal fly ash for manufacture of clc/ foam concrete
Technical Question of Civil Engineering
how to caluclate sienerge qty in construction in ap
Caching, Multithreading and RAMBUS are 3 methods for resolving the Bottleneck problem. Please give an explanation for each one (how are they resolve the problem?)
Dear Sir I Mahesh C. Bhamre have already given a Exam for Superintendent Officer / Public relation Officer Exam Dharmday Aaukta held at Nashik on Date 29/08/2010. My seat no was 5040247. and my cell no is 9822677994. and my mail Id is - mahesh.bhamre@rediffmail.com So can you pl send me details of result of respective exams. Thanking you in Anticipation.
sir, please send me the web address of chennai railway to know the online examresults of junior engineer[civil].
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
how to calclate the SHUTTERING TAKEN CONCRETE LOAD? WHAT IS THE LOAD BEARING CAPACITY IN STEEL SHUTTERING PLATE? WHAT IS THE CONCRETE LOAD IN (MASS) IN THE SHUTTERING PLATE. PLATE SIZE IS 120CM* 90CM CONCRETE WALL LENGTH IS 10M ,WIDE IS 60CM, HEIGHT IS 1.2M PLS TO SENT THE CALCULATION.
For sloping slabs or sloping beams why the tension steel from either side of ridge is taken into compression zone of other side?
When column of building is abutting the boundary line,then suitable footing advised is
how to calculate labour strength for work for RCC,brickwork,blockwork,in &out plaster,flooring,dado,door frame & shutter,painting etc for constructing highrise building?