suppose we have a tendency to make a hole on the surface of
the beam, than where we goes to make it?
Answer Posted / ashutosh
in the design of RCC beam we design it as a crack section neglecting the area of concrete below the neutral axis so we can make a hole in concrete in the area below the neutral axis .
| Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
What is the sugested procedure of water purification for public supply?
For the symmetrical continuous beam shown in figure, Prestressed with a force P = 1500 KN along parabolic curve as shown, compute the extreme fiber stresses over the central support for the uniformly distributed load of 24 kn/m. Use load balancing method.
How to plan a project
what are the duties of Site Engineer in work site?
Curing time for 1)R.C.C slab 2)B.W 3)Plastering
what isload waring calculation
What is the strength of cement?
what is project?
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
what will happen if one could not properly follow the spacing of slab reinforcement bar?
How to make tiles floor step by step procedure?
. Write a C program to perform following functions:- a. Declare one integer variable of all the storage classes. b. Print all the variables without assigning any values in tabular format. a. The tabular format must contain the variable name, type, storage class and printed value on the screen in RED color.
what is density of 20mm coarse aggregate.plz send answer my below adress e.mail
If density of cement is 1500 Kg/m3, the how is specific gravity 3.15 ? (Density of water is 1000 Kg/m3)
Would you cause a 55-gallon drum of water to weigh more by climbing in?