Answer Posted / ramachandra naidu
-> V-model is graphical representation of the system
development lifecycle.
-> The left tail represents the specification stream where
the system specifications are defined.
-> The right tail represents the testing stream where the
systems are being tested.
-> The left tail refers to "Verification" where as right
tail refers to "Validation".
| Is This Answer Correct ? | 2 Yes | 1 No |
Post New Answer View All Answers
please send me database stored procedure checklist.
What is the difference between web based application and client server application?
Explain some techniques for developing software components with respect to testability.
What is manual testing and what is it process?
As you are working with cmmi level 5 company ,can you tell me what processes you r following as QA engineer?
hello there, can anyone tell me what type of question does lg soft company ask in written test especially for a quant part? Thanku
Test approach to windows scheduler?
What is a code walk through?
How can you define state tanstion testing aswell decesion testing with examples.how you can differ them too??
Do write a separate test case for regression testing? If it is yes, explain how to write the test case?
can u merge 10GUI map files into a single GUI map file in winrunner?
What is exploratory testing and when should it be performed?
There is an opening in our organization Sierra Atlantic, Hyderabad. All Manual test engineers with 2-3 years of experience can forward your resumes to mah_cs82@yahoo.com before May 01, 2008. (Only manual testers) with a covering letter, current CTC and Expected CTC.
Can any one say me how to do Performance testing step by step plz for a desktop application(offline application).all the data is stored in internal server itself can any plz help me. ts quite urgent friends.
what are the typical problems in web testing?