Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

if an alternator or turbine using fuel to produce ele energy and we didn't connect load to the ends then where was gone the ele energy

Answer Posted / ashok bhatnagar

The energy goes in friction and windage losses in running
the turbine and generator. If you load the generator more
fuel will be required to maintain the speed. If you do not
connect the load then any increase in fuel supply will
increase the turbine-generator speed.

Is This Answer Correct ?    4 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What do you mean by the zone of protection?

1101


What is a single phase autotransformer?

1117


Mention what are the types of semi-conductors?

1228


How to calculate the no of Ceiling fan (1200mm sweep) per unit area?

2085


what is the chiller and working principal

2349


What is the fault or needs to be done when frequency in ac drives is not changing?

1668


what will be the effect if you were using different brands of outlets?

1935


after how many spot we must chang secondry cable in portable spot welding gun?

1952


What is the difference between acs 550 & acs 850

5819


how we can calculate chiller required ampear?

2068


gas turbine genrator reactances

2010


what will happen if there is a voltage leakage or current leakage in an electrical train

2029


Mention the difference between Analogue and Digital circuit?

1144


An ISP is granted a block of addresses starting with 150.80.0.0/16. The ISP wants to distribute these blocks to 2600 customers as follows. a) 200 medium size businesses; each needs 16 addresses b) 400 small businesses; each needs 8 addresses c) 2000 households; each needs 4 addresses Design the subblocks and give the slash notation for each subblock. Find out how many addresses are still available after these allocations.

7712


how the B-H loop obtain under the static condition

2345