If a Page is having 5 Links and there are 5 users and each
user is clicking on one link. How can we achieve it in
Loadrunner.
Answer Posted / mahe
we can record 5 different scripts and run in vugen and then each scenarios are assigned and attached in controller with 5 users each a scenario and we can run the scripts simultaneously.
| Is This Answer Correct ? | 0 Yes | 12 No |
Post New Answer View All Answers
What is manual correlation?
What is filtering and sorting?
What is the think time?
What is the modular approach of scripting?
What is the difference between hits/second and requests/second?
What is elapsed time in load runner?
What are the three sections of a vuser script and what is the purpose of each one?
What is scenario default?
What is gui vuser and on which platform it will run?
What is performance testing in loadrunner?
What are all the types of goals in goal-oriented scenario of load runner?
What is the difference between web_reg_find and web_find?
How many vusers are required for load testing?
What is the number of graphs you can monitor using controller at a time? What is the max of them?
How could you measures Https/Sec ?