The company is wiling to buy you 5 pcs of equipments in your
electrical tool kit. Plz tell what are the 5 things you want?
Answer Posted / pillay
I would prefer 1)multimeter 2)clamp ammeter 3)adjustable
wrench 4) pliers 5) screwdriver
| Is This Answer Correct ? | 23 Yes | 5 No |
Post New Answer View All Answers
WHAT IS THE WORKING PRINCIPLE OF A GENERATER.how is a GTG (Gas TURBANE Generater) working.plz explane
How do we arrive at selecting reactive capacitance value as 30% of h.p rating of motor?
what is the difference between Central Battery System and UPS in applications and uses? and why UPS suitable for Computers and central battery for emergency lighting?
at what basis/standard we have to arrive the current density of aluminium/ copper in busbar?
High voltage test procedure of in swgr board. why should measure millivolt drop on testing time?
can you plz send l&t aptitude questions if available its urgent plz plz plz
sir please tel me how calucalte kwh if home taken load 30ams how maney kwh taken per day.and 3phase motor 5hp per hars how maney load teken and how mach kwh and forward me to electrical table for calicalte kwh and kvr and kvah
How much should be the load percentage for 15kva Inverter and Iinut & I output load with Calculations
what is differant beetween overload current and phase current?
Hi Suppose we have a wye/wye transformer which is grounded at both sides,in this situation, do we have ay ground transformer? in other words, ground transformer can do any thing more (while we have nuetral wire in both sides)? As the last question, what about 3rd harmonic? we have two choices: first using wye/delta transformer + ground transformer and second using wye/wye earthed connection.in the former choice, we dont have 3rd harmoonic at the secondary side but what about Yn/yn conection? do we suffer from 3rd harmonic in the Yn/yn connection?
What is the function of retrip in busbar?
How to design the no. of ceiling fans required in 5mtr X 10 mtr X 3 Mtr hight room?
what is the difference b/w ground & virtual ground?
Why corona leads to production of Ozone and glow of the color VOILET?
Dear sir, my knowledge about cable size determination is limited. Though I read examples I could not calculate the Cable size required for electric driven pump 40 KW, 380 Volt, 50 HZ, 50 meter from transformer and it is three phase star delta starting. Please help as there is no one in my surroundings to help.