Answer Posted / reji
the above ans is correct. moreover, the DC resistance of T is much less compared to its reactance. ie, impedance is huge . thus when T is connected to DC, a very high current will flow and the winding will certainly burn.
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
WHAT KIND OF LIGHTENING PROTECTION SCHEMS CAN BE ADOPTED FOR THE FLAT ROOF OF BIG DIMENSION.
what is the safety of voltage power transformer(2250KVA0
1. The DC generaror,s induced output emf is connected with a DC motor(as load). when increasing the load of the motor by using brake drum or any way. what are the parameters will changes in both motor and generator(voltage, current, resistance, frequency, speed, torque, power, flux etc...) 2. Similarly for AC generator and AC motor 3. similarly if using DC batteries instead of DC generator, What happens?
What Maximam Gap Taibaar & Bush
what is smart grid? why we use it? explain in detals bcoz i want give presentatin from it....
Why the standard of ambient teperature mentioned as 40 degree celcius in machines.
what is saturation kit?which use above 15 kw motors panel side.
700KW 6.6KV slip ring induction motor to use VFD to control the speed
Why Water motor is not taking a load or pressure while everything is correct. (Note: Motor running properly)
How can we measure earthing resistance test (Earth meggar) of Transformer neutral pit while in live condition?.
Why is the air gap between the pole pieces and the armature kept very small?
what does mean of RCT and STR in diffrential CT?
why EMF IS INDUCED IN A CONDUCTOR WHEN FLUX LINKING WITH IT CHANGES ACCORDING TO FARADAYS LAW.
Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.
How to distinguish whether MCB is DC or AC looking at it physically