HOW TO CALCULATE REINFORCMENT IN STAIRCASE CRANKED BEAM

Answer Posted / nadim

the length of the soffit can be calculated by pythogorus thearom and the laping length wil be provided in general drg of staircase by RCC consultant , the rings can be calculated by the depth and width given in its schedule

Is This Answer Correct ?    15 Yes 3 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the effect of duration of earth quake on framed structures ?

1813


Explain what is alternate bid?

799


how can can column be corrected when the design is not safe ? is the increasing the clearcover a solution?

1190


Design a shear wall of length 4.20 m and thickness of 250mm subjected to the following forces.Assume Fck = 25Mpa and Fy = 415Mpa and the wall is a high wall with central part 3440mm x 250mm and two 380mm x 760mm strong bands at each end with following loading. S.No.       Loading        Axial force      Moment     Shear 1               DL+LL          1950              600            20 2           Seismic load       250              4800          700

1530


1)Why we can use half brick in 4inch wall and 2)why not in 9+inch brick wall

1934






Sometimes the side of concrete bridges is observed to turn black in color. What is the reason for this phenomenon?

703


pls mail some more tecnical qustions at msaranya2610@gmail.com

1709


What is the mix propotion of M10,M15,M20,M25,M30,M40,M50.M60 cement content,aggrigate,sand and water ratio.

4221


what is the dimensions of river sand truck trailer or trolly ?

3383


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1351


how find the cut length of tringular ring and any formula find out the quantity of circular brick work

5689


How many types of slabs are there & how to design it?

775


How to cal. The weight of hollow pipe?

731


What is the requirement for over all CG of DG from the foundation surface to absorb the vibration of heavy set.

1611


how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour

1097