Answer Posted / vinothkumar
In single phase,when the phase current is not coming through
neutral that time only it will act.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
placing earthing pit in pathway is correct or wrong??. placing earthing wireGI1/18 inside walls is correct or wrong?. explain!!!
what you have to see after one week or month from the day of installation of transformer ?
why we use condenser in the thermal power plant, althrough the same vapour will be again heated
Dears we deal in Chemical are Plate earthing. Kindly call if any requirement and questions. Tech Earth Solutions Mohit Verma 8791071007
what is cause of static electricity? I experience shock when i touch metal equipment in a room ,furher check shows earth leakage showing 80ma at the DB near to the 400 MCCB?
why the value of k is more in shell typr transformers?
What is tan delta & PPM in transformer? and whats its IS value?
hi, in the event earth grounding is not available in a project, is there any other way to make the elcb work? fyi, i have an instant water heater (6.5kw) installed, however if there is grounding in the heating element inside the heater assembly, i will get grounded. thank you in advance to those who will answer my question.
If Neutral Grounding Resistor (GR) failed/shorted. Is it repairable.
What is the range of the stator resistance of 3 phase induction motor?
which book to refer in electrical engineering for iocl exam & which book for general english.
what is the calculation involved to design the heater to heat 10KL of water in temperature control unit?
Some times to change of DOR of a motor, interchange of R & B is not effected and RYB take same current, but interchange of R&Y is effected ie change the DOR. My doubt is what is the problem in motor and how it is happen.
We have 750KVA DG set, we want to introduce REF relay with 1250/1A,CL PS,Current transformers.The lead distance of 2.5mm copper flexible cable from CT to relay is around 5mtrs.We would like to know the knee point votage(VK) & IM calculion for CT's
what is the question paper model for section engineer in RRB