18. What is the thing that might make you happy at your
work place?
Answer Posted / sandy
come up with a more economical design than our seniors and
get appraisal from Manager
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
What are the points to be considered for calculating cement reconciliation. a)Do we need to deduct the wt of cement bags b)Do we need to adjust the qty due to wt loss during transportation, loading unloading etc or else each bag can be considered as 50 kg bag c)What is the proportion of mix cover block making.
Soil bearing capacity formula
Which are the top apps for you civil engineering?
Tell me about triple point of water.
What is the Roll of Water Bonding under VDF road?
How do You Maintain a structure after getting cube test of low strength.
what are the strength theories for yeilding and fracture materials. state the theory more suited for 1. mild steel or 2. concrete
How to increase a bearing capacity of soil?
I used Etabs software to analyse a high-rise building. And I want to use templated UBC-codes inside to calculate the Seismic load. My question is: whether or not I have to control the seismic load by base shear load which is manual calculation? (just for more clarification: I can control this by input the scale factor into Eartquake definition in Etabs) I would highly appreciate your answer.
What are the responsibilities of a construction manager?
que.is ideal size of bricnk use in india,joint size of mortar in massinary ,how many bricks used in 1cum.how to test at site.what is the possition of marka used in bricks?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
i am completed my b.tech EEE in 2009,,,iam trying the job 3+ for AUTO CAD (ELECTRICAL),, what is the market for autocad electrical in hyderabad... how to handle the intervws give some suggestions ?
What are the delays in construction projects due to approvals from owners? How can we analyze them in different prospective? Whats their affects and effects on presently going work?
material used for mendrel use to bend epoxy coated rebar