one cubic meter of concrete contains how much proportions of
cement,sand and course aggregate
Answer Posted / ramir v, agustin
limits: 65%-80% coarse and fine aggregates
w/c ratio: less than or equal to .40 will give you
40 mpa or 6000psi or 40 N compressive strenght.
| Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
As per Kandal suggestions, we have implemented rolling starts on 140 (+/- 5) degrees and we kept 3 rollars to complete the rolling before falling 125 degrees and the Aggregate AIV is below 22. But When the DBM bed is being rolled 3rd high viabration, (Before 1 plain & low ,2 high Viabrations), the aggregate is getting sharp edge agg. projections are damaged. As the literature is said that, the VG-30 Grade having better control the temp. susceptibility than Penetration grade. if so we could not get this problem at site. But we are facing on site. let me know.
Kindly post me previous year interview questions with answer for post of DY. Manager (civil engg.) for GAIL, NTPC, IOC, OIL and ONGC etc.
How much area, in square meters, will one liter of paint cover if it is brushed out to uniform thickness of 100 microns?
is basic cost of the material includes tax?
Explain what is zoning permit?
Providing ,Cutting, bending and positioning of TMT Bar with cost of binding wire
How to come 1.54 from dry to wet concrete?
Define graphics window?
from one meter cube of stone masonry structure how much cubic meter of cement mortar we use as our estimation 25-30% is that correct for estimation of quantity of sand and cement(2:1) proportion of mortar
What are the phases inspections are done by local authority while construction?
at which depth the construction of tunnel is economical from cost and engineering aspect.
which software is better for design and analysis of buildings (stadd pro ) or (Etabs)
factory shed foundation l=4, b=3' d=8' rcc foudation for top to bottom pl tell me cement ,steel ,sand ,labour cost ,excavtion,soil is weak not so hard
Iwant to calculate the production of 1 labour for concrete casting which includes shuttering,scaffolding,steel fixing,concreting, deshuttering and curing in 8hours.But i am not able to determine it approximately would you pls.??
what is the difference between prime coat and tack coat in road construction