What is m & 20.&
what is fe&415.

Answer Posted / vishal s rao

M means mix and 20 means the characteristic strength of the concrete cube attained after 28 days of curing.
Fe is the chemical name for Iron and 415 is high yield tensile strength of the bar.

Is This Answer Correct ?    0 Yes 1 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

material used for mendrel use to bend epoxy coated rebar

1842


What is rate of concrete surface rendering work per sqm

1430


How to hide dimensions in autocad?

632


What you understand by richter scale?

702


plz drive the formula d2/162.162 for the calculation of weight of steel bars????

36336






I need old MMUP exam question and answer for Civil engineering

1155


what is the sequence of the activities in the typical under ground water tank including civil & MEP works.

1950


2. What are the advantages of your present job, things you like about it?

2705


What is binding spacing of the rebars at lapping zones.

610


how ratio is calculated for any grade of concrete. for e.g. sppose M20 requires(x;y:z) quantity of cememt sand and aggregate.

1556


what is concrete canvas?

1768


Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.

1985


HOW MANY BAGS OF CEMEMT USED IN PER M2 OF PARTITION WALL

961


How to calculate density of 40 mm coarse aggregate, in mixing ration 1:1.5:3? Please explain calculation for density

1543


How to find out slope footing concrete

2422