Answer Posted / vishal s rao
M means mix and 20 means the characteristic strength of the concrete cube attained after 28 days of curing.
Fe is the chemical name for Iron and 415 is high yield tensile strength of the bar.
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
What expenses counted in contingencies and how much it is in related to built-up area of the building.
If 40 backlogs are cleared m finally with 65 percent marks . Am I eligible to get visa to US
What is difference between engineering stress and true stress?
I need old MMUP exam question and answer for Civil engineering
what is called Bulk Density of aggregate?
what is the service corridor?
i have four storeyed rcc building.basement of the building is around 34 years old.it does not have pillar support.it is having lintel steel support at every 7 feet of construction. how long this building will lost long . can any body help me in this regard
what are the duties of Site Engineer in work site?
What is the minimum size of the particles of silt soil?
Which are the Steel tests ?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
(Project Management Topic) What are the important criteria in the successful realization of the project?
Explain what is 1/8 on the architect ruler denotes?
Does VDF add strength to the flooring apart from preventing water ingress?
Define What glue is least sticky?