which test comes first installation testing or
compatiability testing
Answer Posted / mahendra
compatabily testing,in this test engineer validates that
whether our application build runs on costomer expected
platform or not?
installation testing,in this tester has to observe
.setup program execution to start installation
.easy interface during installation
.occupied disk space after installation
compatabilt testing comes first
| Is This Answer Correct ? | 0 Yes | 2 No |
Post New Answer View All Answers
What r the documents required for performance testing
What is regression testing? When to apply it?
What are the different types of software testing?
What is a good test? Wy do we need testing write test steps for triangle write test steps for ATM How a tester should approach a devloper about non accepted defect? What is test coverage assurance and give an example Draw and expain V model and how it is helpfull in software development
What’s the difference between a bug and a defect?
in an online banking software,users are connecting to bankserver by login.This login module can take below inputs for user. a/c number prefix-3 digits but doesnot start with 0&1 a/c number sufix-6 digits number password-5to 10 chars alphanumerics in lowercase areacode-3 digits number but optional purpose- cheque deposit money trasfer mini statement bills pay After filling above fields,user can click submit button to connect to bank server.prepare test scenarios for online banking s/w login.
1) Difference between "Delete" and "Concatenate" with reference to databases? 2) Difference between SDLC and STLC. 3) Latest versions of the browsers used. 4) What is URL Tampering? 5) Full form of URL. I don't need the answers. These are just for reference.
what is prototyping model,RAD model V model, spiral model?????
I studied MBA, I want learn any softwarecourse, which course is better hadoop or testing tools(manual+selenium?)
After insert the record in front-end, how will you check the back end by manually? Please explain?
Hello everybody, How many people do you think one sprint team can have in average?
On what basis you are fixing up the time for project completion?
how will the test plan is pepared in ur organisation>?
What is software configuration management?
What is an error?