Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is the meaning of improving the power factor (give
technical ans not therotical)

Answer Posted / kavidasan.k

the cosin of angle of voltage and current is called p.f.

the connected loads are may be indutance and resitenance
means it will have lagging p.f(e.g.0.75p.f.)that means u
are consuming only 75% of power but u need to pay 100% for
that in this situation we use capacitor banks(capacitor
have leading p.f.)this capacitor bank will reduce that
lagging,so u r power factor will improve to(e.g.0.95)so u
now consuming 95% power for the same cost as u pay before

Is This Answer Correct ?    15 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Minimum IR value of 1.1 kv grade 3.5c (300, 240,185,150,120,95,70,50,35,25) sqmm Aluminium XLPE cable and 4c (16, 10,6 & 4) sqmm cu arm cable between RY,YB,BR,RN,YN,BN,RE,YE,BE & NE.

3346


What is the unit of charge and current?

1162


what is rocking arrangement in arc heating

2138


Dear sir, I have completed DECE in the year 1995. I have work experience in HT and LT LINE more than five years. Now i am doing BE in EEE from rajasthan university. After completion of BE,can i apply "C" Licence sir? Please reply.

1912


Explain about retrofitting of machine tool.

1900


.php|

2183


i am electrical and elctronics engg passed out in 2009 want to attend for reliance placements.plz send me apttitude ,technical and hr question answers to my mail plz. my mail id-kat.bindas@gmail.com

2023


This is reqd for a 1MW Solar power plant..We have 2DC outputs from the solar panels Connected to 2INVERTOR panels.. Output from invertor is 3ph,280v,500kva,50hz.These are connected to individual ACB.This has to be stepped up to 11KV ,1250KVA SYSTEM.Now can I use (1) one more ACBTO GIVE A COMBINED OUTPUT OF 1000KVA,280V & STEP UP THE OUTPUT BY USING a single two winding 3 ph transformer 11kv/1250kva. or (2)use the two outputs and connect to one three winding transformer of above rating..Pls suggestwith details.

2477


what are the breakdown voltage rating of mini- curcuit'transfarmer!

2172


what is the terminal voltage of dc series generator running at rated speed at no load?

7631


how to find number of run cable laying[LT side] for transformer & alternator secondary side? [above condition for getting output power transformer to main panel side] give the example.

2074


1. A bomber drops a bomb from an aircraft flying at 2000 km/hr. at an altitude of 7km. The speed at which the bomb will strike the earth would be

1909


Different types of relay fault which phase sequence??

908




2425


why the perameters of secondary circuit are more important then that of the primary circuit of induction motor?