how much quantity of cement bags are required to fill the
one m3 of empty container.?
Answer Posted / husain
28.8 bags of cement required to fill one m3
| Is This Answer Correct ? | 73 Yes | 8 No |
Post New Answer View All Answers
How to build the floor to ceiling bookcase?
for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.
What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
What is thumb rule for deep trench excavation
how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is the cost of rcc roof casting of 400 sq. ft. in kolkata
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
what is the types of surveying?which type of survey carrying for type of work?
how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?
Technical Question of Civil Engineering
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?
What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)