Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

how much quantity of cement bags are required to fill the
one m3 of empty container.?

Answer Posted / husain

28.8 bags of cement required to fill one m3

Is This Answer Correct ?    73 Yes 8 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

How to build the floor to ceiling bookcase?

1452


for 16mm thick cement plastring 1:6 on 100 Sq.m.New brick work,the quantity of cement required is.

2003


What is the cost of shuttering per Sqm.? How it is calculate by thumb rule...?

1950


how to take the quantity of block work and plastering  1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate

2451


What is thumb rule for deep trench excavation

1791


how to frame the sentence in voucher pad ? Description : 1.Food Expenses during site visit 2.Stamp Paper approval expenses 3.Travelling expenses 4. sweet distribution

2142


1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25

2763


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

3737


On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??

3277


what is the types of surveying?which type of survey carrying for type of work?

2165


how to calculate the mortar for 10'*10' size room for both plastering and for masonry work?

1760


Technical Question of Civil Engineering

2259


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

1798


In the design of bridge arguments what considerations should be made to select the orientation of the wing walls?

1056


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2098