why we are called the 4-20ma transducer,not 0-20 ma
transducer??
Answer Posted / vaseekaran
Let us keep the value as 0 to 20 mA,
The valve we measure in the output will be zero if the meter is in idle state and also it will show the same zero even the instrument is in fail condition.so we cannot get the exact and get confused if there is a problem in instrument while cross checking.this is the reason we are using 4 to 20mA.if the instrument fail then we can get only zero and if the instrument is idle we will get 4mA.so we can easily differentiate it.
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
how do you test tachos and servos
A 15 kw squirrel cage motor having a maximum efficiency of 90% on a continuous full load has temperature rise of 42 degrees celcius after 30 min and 52 degrees celcius after 1 hr under the above operation conditions. a) calculate its final steady state temperature rise on continuous load and the heating time constatnt. b) if the motor is operated on a short load for 9 min estimate its temperature rise. c) calculate the maximum overload that can be applied on a short, 9 min rating so that the temperature rise is the same as the final steady state temperature rise on continuous load.
What is inverse definite minimum time lag relay? Where is it use?
What is Anemometer used to measure?
What is principle of Floroscent tube 36watt.
which is better to use svc or synchronous condenser why ?
What are test values for an 63 KVA and 100 Kva Distribution Transformers for the following typical tests 1)Magnetic balance 2)Short circuit test 3)Open Circuit test 4)Vector group confirmation test .please give me the standard values for all the above tests.
What is the drawback of class b amplifier? How is this minimized?
WHAT IS MEANT BY OVER EXCITATION IN GENERATOR TRANSFORMERS? DESCRIBE IT.
Can any body tell me about INNER SHUNT COMPOUND MOTOR diagram?
How can we choose the rating of submersible motors
which type of questions asking for solar companies?
can u please mail me the syllabus for GET exam for damodar valley corporation?
why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving
ELECTRICAL ENGINEER TEST IN FEWA ANY ONE HAVE KNOWLEDGE ABOUT THIS?????????