1 cubic meter contains how many bricks
Answer Posted / raajesh kumar m.s
Normal brick size is 9"*4"*3"=0.0618cft
1cum=35.28cft
35.28/.0618=571No's......This is not with mortar
If in Mortar1:6 (9"wall)=408 Bricks
If in Mortar1:4 (for4"wall)=459No's
| Is This Answer Correct ? | 12 Yes | 5 No |
Post New Answer View All Answers
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.
how to calculate Rate of analysis for 100 m3 Any ratio of concrete ? including labour
What is portland cement
What in bending moment, if a moment is free end of cantilever beam?
How to calculate 1 brss for RCC work
1.what is the mix proportion for cement soil compressed earth blocks? 2.how to calculate the mix proportion for cement stablised earth soil blocks?
Define What materials were used to build the Golden Gate Bridge?
Rate analysis of Vitrified tile in cement mortor 1:3
How to calculate the force on a column of three story building. What should be the base concrete height?.
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
Rate analysis for construction of a solid block masonary of size 400x200x200 in C.M.1:5 in superstructure .Compressive strength 5.00 N/Sq.mm Confirming to IS: 12894:1990, with necessary scaffolding, raking of joints and pointing the same. I require rate per Cum.
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
Define a polyline?
what is the water-cement ratio of mix design while 30mpa in 7 days?
Suppose you planning to paint newly fabricated workshop building made of structural steel of 10 tons total mass. How many litters paint primer for 1 coat and 2 coat of top coat?