Answer Posted / suresh
Broad disciplines are electrical power engineering &
electronic engineering. The former is concerned with the
generation, distribution, & use of electrical power & power
control & instrumentation processing of the formation in
the fields of communication & control system, electronic
computer, industrial electronics & instrumentation
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
What is the difference between amorphous core transformer and CRGO core transformer?.
Batteries used for electrical energy storage are a. Laclanche cells b. Edison cells c. Lead acid cells d.any of the above
Is it possible to operate a synchronous 2-poles turbogenerator with a still-in-place faulted bar but electrically disconnected ???? If yes, should I act on the other phases as well ???
how to i get B licence,i am completed BE electircal and electronics engineering.i want to konw the proceduure to get b licence
why in an industry; machine having rated 200 h.p stopped after power factor is maintained above 0.97 lag by control panel in view-of energy saving
Do Phase angle measurement have any application in freq/harmonics measurement? If so how?
why different series of vfds (like allenbradley)are used in industry ?
WHAT IS THE FORMULA FOR CALCULATING CURRENT RATING(DIRECT IN GROUND OR AIR) OF ARMOURED(XLPE) CABLE OF 4C,16Sqmm?
What is called limb of a transformer?
What is domestic transformer? Draw the connection of domestic transformer.
Sir, I have applied for the of Jr.engineer(Electrical & Electronics) & ASST. LOCO PILOT at ALL RRB BOARDS. please send me all RRB Boards solved papers in the year of 2001 tO till date. i requested send me the papers to my id as soon as possible (jet_0991@yahoo.com). (This is very urgent) Thank You,
if any house we instaled a 1.5 ton ac and its phase cable of wiring is installed but netrual cable of wiring not instaed. my question is that is neutual of house(for other wiring is capable for ac load or a sepeart neutrual wiring required
Why the unit sizes of hydro generating machines are not standardized as in case of thermal powerplants?
working principle a.v.r. ?
why it is not advisable to run low rating (19KVA) DG sets in parallel for long durations even though they are provided with droop ckts (QDC)