How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow?
sand=Rs.500/mt
Brick=Rs.5/brick
Labour=Rs 300/day
Free issue=cement+water+electicity.
Answer Posted / dipak d patel
1 Bricks no. 5000.00 005.00 25,000.00
2 Sand cum 2.64 706.00 1,865.72
3 Cement Bag 15.60 000.00 3,120.00
4 Labour Day 16.00 500.00 8,000.00
5 Mason Day 07.00 500.00 3,500.00
6 cont profit, OH to be considered as per your
regualations. Normally 15% to be considered for the same.
Total Rate for 10 cum without contractor's profit is
41,485.72 Rs/10cum.
| Is This Answer Correct ? | 2 Yes | 3 No |
Post New Answer View All Answers
how calucate cement sand ratio for plstering
What is thumb rule in quantity and cost estimation of a residential building?
How high should the water tank be to provide a 60 psi at base of this water tower?
For a washout valve why are two gate valves required in normal practice?
How much quantity of rod binding work by a rod binder per day
how to caluclate sienerge qty in construction in ap
Water filter calculation formula
why are you joining in this (applied post) job and your aim for this job
What are the problems one might face while having a Cantilever balcony?
what is spacing of wallar support of 3m column. the thickness of column is 0.25 m.
what is directivity effect?
What is Grid floor and mention its advantages ?
What is the difference between one-way slab and two-way slab?
pls give me ans to ACT formula cube testing porpuse
What is the tensile strength of wood?