Cost control in civil construction as well as Quality control
Answer Posted / aijaz hussain, modi builders
Following Factors are required to be keenly observed for
cost control in civil engineering:
1) Proper usage of resources in time
2) Proper Planning and safety
3) Avoid wastage of resources
4) Quality awareness in workmen and supervision/ execution.
5) Usage of good quality material
6) Usage of skilled workmen thus controls corrections.
Is This Answer Correct ? | 1 Yes | 1 No |
Post New Answer View All Answers
In Rcc ratio calculation I wanted to know quantity of Steel also.
What are the ingredients of pre-stressed concrete?
Explain different types of rcc pipes.
(Project Management Topic) What are the important criteria in the successful realization of the project?
What is the difference between 53 grade and 43 grade cement
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
I am a civil engineering student and going to attend interview in this week in an IT company.Will they ask me questions about my area of interest or cs
3. A vane 12.5 cm long, 8.8 cm dia was pressed into a soft clay at the bottom of borehole. Torque was applied and the value at failure was 55 N-m. find the shear strength of the clay on a horizontal plane.
why we use aggregate,sand with cement in concrete?
what is your role of in previous company as a construction manager
what is the minimum compressive strength of clay brick
how to calculate the material from ratio of work PCC, RRM,POINTING, RCC
How to calculate concret slab? W l t(4mts*5*2fts) ratio m25 grade pls tell me procedure
In case if concrete box girder bridges how is the number of cells determined?
what is the mix design for M:60 with micro silica andmetakaoline?