1)Several lightining arrester is used at the top of towers
lightning mast ,& buildings.
2)shild or ground wires are used above transmission line.
Gound wires are also used above & throughout the sub
station .
3)40mm or 32mm Ms rod are placed to entire area of plant
with wealding joints.
All lighting arresters and ground wires are connected
through the MS gried.

Is This Answer Correct ?    0 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

how to calculate units consumption for a 12 hp motor /hr.

1037


How to calculate of maximum demand if given 628kw, 785kva, 0.8 p.f.

1223


How to select batteries required for ups and the inverter if we Known load? And how AH is selected of battery?

885


what are the dimensions for 200 kva transformer plinth (plateform),in which pcc m20 is used..

10769


How to perform a DC resistance test In Alternator and their proceduces?

1069






Please clarify, 1. Is it required to lay two runs of GI wire along with Armoured LT cable if it is laid between one big mains (63Amps TPN SDF) to small main (32A TPN SDF) with proper glanding termination? 2. If the armoured cable with proper glanding is laid from DB to CNC machine, is it required to run two runs of body earthing to the Machine from DB? 3.If the armoured cable with proper glanding is laid from Substation to Hangar, distance is approx. 100 mtrs, is it required to do earthing at shop area though the primary termination at substation is earthed through gland.

1561


wheather the size of windings in motor and generator are the same

1507


what is the difference between interconnection and intraconnections in the circuit diagrams

7557


sir my exam is on 19/6/2013 under electrical branch pls send me sample aptitude questions as well as sample technical questions for jindal steel and power company

1806


we are small scale industry in production of rice & rice bran. Pls let me know how to take contract demand for our industry.. (for information we have total 600.hp)

3454


IN induction motor pf is increased using capacitors.what will be the effect on motor and system when very large capacitor is accidently installed and pf goes leading.

1625


Work done in a free expansion process is

705


How to decide DO set rating of Transformer?

1157


What are the no-load losses for the 11000/415V transformer with the following rated capacity? 1.1500 kVA 2. 2000 kVA 3. 2500 kVA 4. 3000 kVA

1157


If I want to connect a capacitor bank on the HT side of a 11kV/415V, 3 phase delta-star distribution transformer to supply Reactive power to it..what practical specifications of a Capacitor bank that can i've??please reply..

2038