Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

How to convert rainforcement calculation: Running meter to kg

Answer Posted / shaikh moyunuddin

Weight of 1m long steel
;-
1) for round
Length=1m
dia. of bar=d
weight of 1m long steel=((d^2)/162)
ex:find out 1m long & 10mm dia. bar
=((10^2)/162)*1
=0.617kg
2) for rectangular or square
Length=1m
brith=b
Height=h
weight of 1m long steel=L*b*h*7850
ex;find out 1m long,brith=3cm=0.030m,height=3cm=0.030m
=((1*0.03*0.03*7850))
=7.065kg

Is This Answer Correct ?    5 Yes 0 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

What are the RISKS during the project construction?

2340


hoe much fine & sourse agregate required for concrete mix of 1: 1.5:3 by volume in Cu.Ft

1906


Explain different types of rcc pipes.

1212


what is meaning of inverted beam.is it way to provide double mat in slab one at bottom and another at topif we go for provision of inverted beam. shall we construct structure with out plinth beam for us we have to construct small bus shelter

2560


Define What is the force exerted by the Tacoma narrows bridge?

1220


What is a hatch patterns?

1148


how is the reinforcement is distributed in triangular slab

2288


which method is used in semi-rigid connection design??

2324


what is the cost of rcc roof casting of 400 sq. ft. in kolkata

3837


What happens when,in Prestressed girder the HDPE duct and cone size is provided more than required? (technical answer expected)

2170


types of survey and levelling instrument ?

1937


Define What is a projection line?

1205


how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.

3835


What is the strongest bridge for a school contest?

1221


what mean By core Billing

2367