Answer Posted / dipen
20CMX10CMX10CM
above dim.is with motar
19CMX9CMX9CM without motar size
| Is This Answer Correct ? | 15 Yes | 1 No |
Post New Answer View All Answers
How to calculate Volume of Wet cement concrete for a specific grade?
why demand factor less then 1 ?
brickwork labour rate per cum ?
How much cement,sand,bricks and water needed for 1square metre brick work?
How much quantity of rod binding work by a rod binder per day
we want build 10ft height ,tostore 4 litresof water.what is theground basement for steel andcement andsand.please send us basment calculation?
When was the first motorway built in england?
the water is flowing through a velocity of 1.5m/s in a pipe of length 2500m and dia 500mm. at the end of pipe a valve is provided. find rise in pressure 1. if the valve is closed in 5 seconds. 2. if the valve is closed instantaneously. take value of c = 1460m/s, pipe to be rigid and bulk modulus of water - 19.692x10' n/sqcm
Can you pl explain the procedure steps of singly and doubly reinforced beams in limit state method
how to calculate total cost for slab 35'×8'
mix design procedure for 1:6 cement mortar
What is meant by solid geometry?
what is tension footing?
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?
how to caliculate required amount of cement and sand required for 1cu.m.