how to calculate cement bag in RCC
Answer Posted / shanu
cement(c)=1.54+c/c+s+a
Is This Answer Correct ? | 16 Yes | 7 No |
Post New Answer View All Answers
i need gate exam civil engineering question papers with answers
what is tension column?
how many minimum admixtures are used in water froofing structures
Material calculation of cm 1:6 for 1sqm
Design a reinforced concrete combined footing (rectangular) for two columns located 3.60 metres apart. The overall sizes of the columns are 40cm x 40cm and 69cm x 60cm and the loads on them are 1000 kn and 1500 kn respectively. The space available for the width of the footing is restricted to 180cm. The S.B.C. of the soil is 280 kn/mm2 use M15 concrete.
How to calculate Acctually Brickwork Quantity in Honey Comb Brick in circular Soak Pit
Which are the top apps for you civil engineer?
What do you understand by “preset” during the installation process of bridge bearings?
how can i calculate cement in brickwork
how to estimate man power for estimating the time required for completion of a project in terms of carpenters,barbenders,masons for block work ,masons for plasteing ,unskilled labour, painters, tiles masons,plumbers and electricians for medium and high rise constructions and independent villa projects.
Which prize is the alternative to the NOVEL Prize?
What is thumb rule in quantity and cost estimation of a residential building in civil engineering??
In a beam,stirrups are placed closely at ends than at centre due to shear.similarly where would ties be closer to each other-at center or at ends in a column and slab.
how much required strength of cement concrete bricks(size 230x115x75mm)
what quantities of work done in terms of sq.mts/day/ of 8hrs for each varpenter (shuttering) and Steel fitter in terms of Tonnes. For slabs, Columns etc.?