Answer Posted / monika khare
Billing program (for PUDs, cities, etc...) that will track transformers.
Part of that is a 'load balancing' report. The example of a 'load
balancing' report that I have gives actual usage (in KWH) of all the meters
connected to it, converted to KVA and the % it is of the maximum KVA rating
of the transformer. My question is - should I be concerned with the actual
usage or the potential usage? My guess is that if every meter reads the max
usage, it will overload 99% of their transformers. Is this typical in the
energy industry? Are the transformers usually balanced with the actual
usage or the potential usage?
| Is This Answer Correct ? | 1 Yes | 0 No |
Post New Answer View All Answers
what is the importance of earthing system on the generators big capacity and small?
What is a surge supressor why its is used in synchronous generators
Draw a 230kv two-bus bar system showing the following. 1.Two generators (150MW) each connected through one 15.75/230KV transformers 2. 1 outgoing lines 3. Two 230/130 KV transformers 4. BUS PT's 5. CT
What is relation between transmission lines & Communication lines ?
what may the reason for vector shift in a generator?
why the voltage and current in a long transmission line are called travelling wave?
How to calculate the current of Highpressure Mercury Vapour Lamp?what is the basis?whether we have to consider power factor or not?
Shall I use 40A semiconductor Fuses in 32 A SFU ? Frame size is same. What Happen if Fuses burn on SFU?
what is the prosses for getting of 33kv licence (i have completed my engineering degree & working in 33kv substation for contract basis )????
how many single tension hardware are required on a double circuit transmission tower?
Transformer cores are laminated in order to A simplify its construction B minimize eddy current loss C reduce cost D reduce hysterisis loss
What is meant by short-pitched winding?
What happens if the series current double?
Define resonant peak?
1.why should we connect the measuring instruments in l.v side in short circuit test of a transformer? 2.why the power factor is less in open circuit test of a transformer?