which test comes first installation testing or
compatiability testing
Answer Posted / swathi bommavaram
hi pinky, this is swathi.
please check my answer, the question is posted by me.
if my answer is wrong send your answer to this email
my email id: swati_1225@yahoo.com
installation testing means checking whether the application
is properly installed or not at the client's environment.
this duty done by installation engineers not by test
engineers with the help of installation guideliness.
this installation is commmon either for a product or project
but, compatiability definatly done by test engineers for
product(s) only. compatiability means checking whether the
application is suitable or not for all environments.
if it is a project according to the client requirements we
just check in a particular environment.
compatiability done at company with the help of
installation guide lines, if that installation guide lines
are correct then we can apply same guidelines at client's
location also to install the application
Is This Answer Correct ? | 21 Yes | 1 No |
Post New Answer View All Answers
sanity testing is done during regression testing.is it true.if it is true plz explain?
Difference between Re-testing and Regression testing?
What is function points??????
What icon is used in WinRunner to get an explanation of the syntax of TSL?
1.what promted you to become involved in QA/Testing?
What are the advantages of automation over manual testing?
difference between change management and configuration management
write test case for linked in sign up page ?
where do we work with Application, web and Database servers Means which type of applications.
value momentum
What is the Diff between Code Walkthrough & Code Review? What is the diff between walkthrough and inspection? What is meant by GUI Testing?
What is an exit criteria?
What is manual testing and what is it process?
There are some features to improve the performance of a Product. What are those factors?
Explain Test Plan with example? Explain following in the test plan with examples What is being tested? What are pass/fail criteria? When will each test occur? What Hardware & Software environment is required? What features must be tested? What features will not be tested? What are the responsibilities of individuals & organisation in the project?