what is the compresive strength of m20 concrete at 7 day
Answer Posted / ginikanwa nuga adiele
the concrete must have attained 2/3 of the streght = 13.5-14kn/m2
Is This Answer Correct ? | 11 Yes | 0 No |
Post New Answer View All Answers
Explain major differences between routing maintenance and major maintenance.
suppose that 156000 sq.ft rcc work builtup are.how many % of brick work to rcc work.
What is the force exerted by the tacoma narrows bridge?
What is modular elasticity?
How to calculate the cement and fine aggregate requirement for solid block masonry works in terms of Sqm. 1. 400x200x200mm 2. 400x200x100mm 3. 600x200x100mm 4. 600x200x200mm I need the answer for 1 Sqm of solid block works.
how to calculate the dry wt of sand and cement for a required design mix?for ex:M20
How many square meter can a worker/labor demolish a structure per day?
hai, kindly send anyone for output workers format details for construction project in foundation to finishing.
a) Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
what are the proper pipes for salt water line
How is calculate the cube molt
What are the responsibilities of a construction manager?
do we consider shrinkage factor for calculating cement consumption for CM mixes for different works?
Minimum and maximum size of the building components
Define What is a kip?