Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

What is NUMBER OF RUN for power cable means?

Answer Posted / shariff

The number cables connected to each individual phases is
called No.of Run for power cable. e.g if two cables are
connected to each phase then its called double run..

Is This Answer Correct ?    8 Yes 7 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

what is the function and use of cable differential protection relay?

2897


Draw the vector diagram and condition for the following: 1) Dyn1 2) Ynd0 3) YnYn0

3663


We need to current density & short circuit calculation at 65kA for aluminium & copper busbar.

1732


please anybody help me to find out the BHEL trainee Exam previous year questions papers . if u ve pls. send it to surekhared@gmail.com

1947


in the case of 6.6kv motor starter combination contain fuses on it VCB. but in 11KV motor starter combination Fuses are not using in it's VCB why?

2271


what is the total power generation in india?

2315


What is Scheme Test of High Voltage Switchgear. Which tests it includes.

2404


how to size H.T & L.T Panel ?

2122


why ct's&pt'S out put called as burden,why compelsary short ckt the secondary of ct's while removing the burden?

2250


i want to model paper for section engg.

1997


What is an order of a system.

1326


what is alluminium arm in ab conductors

1990


how ceiling fan worked?

1902


mention hazard experienced during installation

1970


Why hydropower stations are preferred solution for meeting peak loads in grids?

992