At 765Kv, I have seen the use of PT at line side for
metering and CVT for protection, although as far as my
knowledge is concern, PT at this voltage level will have
huge loss and more cost as compared to CVT as CVT can also
perform same function of Protection and Metering? So my
question is why use PT and not CVT for metering and
protection in order to reduce the cost.
Answer Posted / k.prakashchandra
Accuracy Class 0.2 or 0.5 is not possible with CVT
| Is This Answer Correct ? | 2 Yes | 0 No |
Post New Answer View All Answers
Why in 6 KV XLPE cable termination kit used and why not in 380 V xlpe cable same is not used
hi....I am from india..i have completed my engineering in electrical and electronics field with 58.4% and my IELTS score is 5.5 bands....Recently i received my I-20 in computer and information science from Troy university in Alabama.On 18th i have a visa interview can u please tell me what type of questions i have to answer ??????
Write the force balance equation of ideal spring element.
How to decide whether A / B / C / D curve type MCB should be used?
what is difference between 5A and 100A CT constructional wise and operation?
How RTCC panel is working and give single line diagram for RTCC with transformer?
is it possible to start a motor in felid connected to a remote mcc
I WANT TO INSTALL LIGHTING ARRESTOR ABOVE 20 FEET HEIGHT INDUSTRIAL BUILDING. NOW IT WAS 15 FEET HEIGHT HOW MUCH DISTANCE IT WILL COVER & HOW TO CALCULAT THE DISTANCE COVER BY THE ARRESTOR
aternator every parts and its working
detailed procedure how we calculate cost for pcc m10 and rcc m20 including centering and labour excluding steel/ iron
How to work definite,over pluxing,revers power,OSR relay
how do you test tachos and servos
harmonics filter
Can 33kva/415v transformer be run underground? If the answer is yes why and if the answer is no why?
How to calibrate or test an LT Air Circuit breaker 440 volts, 35 KA, 800 Amps ?