Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

what is difference between fluidity and workability also how
palsticizer works

Answer Posted / guest

FLUIDITY means the property of concrete to flow where as
Workability means the property of concrete with which it
can be mixed,transported,placed and compacted easily into
the required shape OF Structural member. Plasticzers
increase the workabilty as well as fluidity of concrete

Is This Answer Correct ?    10 Yes 2 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

Define line type?

1117


What things architect have to take care of before starting any project?

1284


What is the difference between EPC,DBOOT and BOOT.

24881


What is the Unit weight of coarse sand (F.M- 2.20) ?????

1976


Discuss some applications of modular elasticity?

1296


What are moment of inertia and its importance in civil engineering?

1300


how can calculate the compressive strength of concrete cylinder by water cement ratio ?

1692


How to calculate 1 brss for RCC work  

2189


How did the romans get water up hills using aqua ducts?

1289


Why should pumping be not used in case of concreting works?

1427


What is the difference between Grade I, II and III of GSB?

2661


Bitumen grades are 30-40,60-70, 80-100. what is mean by 30- 40

94680


50 acre of land to be reclaimed for an average height of 2.5 mt. Dredging area is 500mx200m size. what is the dredging depth required to reclaim the area?

1966


i need the syllabus for the direcr recruitement of executive engineers in andhrapradesh

2416


1) a)to prepare mortar for bricklaying how much amount of water should be added for its maximum strength and workability(to avoid cracks which results, when high quantity of water is added)?is their a formula or ratio? b) suppose we want to make 1:3 mortar,what is the best way to measure cement ,sand and water and how? c)time before which freshly prepared mortar should be used? d)proper way to mix and make mortar? e)when should curing start after laying bricks and for how long?and also how many hours per day? f)what is shear wall (please in terms of layman lol) bookish definisions are confusing.... g) and last,acc to codes what are max no. of course that should be laid in a day.

2125