how cubic feet cement,sand,aggregate required for 1 cubic feet
ratio=1,1.5,3
Answer Posted / mohammed aijaz hussain
Volume of concrete = 1 cu.ft.
Volume of Dry concrete = 1.5 X 1 = 1.5 cu.ft.
Volume of cement required = 1/ 5.5 X 1.5 = 0.273 cu.ft.
= 0.22 Bag = 11 kg.
Volume of sand required = 1.5/5.5 X 1.5 = 0.41 cu.ft.
Volume of aggregate = 3/5.5 X 1.5 = 0.82 cu.ft.
| Is This Answer Correct ? | 19 Yes | 8 No |
Post New Answer View All Answers
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
Minimum and maximum size of the building components
how to check and keep control on the wastage of material at site
to minimize budget cost of building , what can i do
what is tension & compression of steel bending.
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is the exception critarea of cube?
How do you measure water flowing through 300mm diameter pipes?
Who built the sears tower?
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
how calculate the bearing from two coordinates?
what is castigliano theaorem
important question on stones
how to calculate the weight of concrete
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?