what is westage % for steel, concrete,tiles,pains as per
indian staderd code?
Answer Posted / mohammed aijaz hussain
Wastage % of steel = 2.5% to 5%
Wastage % of concrete = 3%
Wastage % of tiles = 5%
Wastage % of paints = 2%
| Is This Answer Correct ? | 90 Yes | 9 No |
Post New Answer View All Answers
How to calculate chejja reinforcement
Which is stronger solid steel rod or hollow steel pipe?
how will calculate 4"thick solid block quantities 1m3 sand cement ratio and breack up detail
How to fix toll charge for a particular vehicle at toll booths in a highway?
What are the advantages and disadvantages of lead products in construction?
How to calculate Cement in bags ,sand in sqft and aggregate in sqft for 1cum M25 grade concrete
Define What is the origin of name Railway Sleepers?
writte a c prog. to acept 5 no. from consule and then display them back on consulte in ascending order
What is the standard rate of installing ties for column(60cmx60cm) and beams(50x850)(weight)
what is the difference between natural draught cooling tower and induced draught cooling tower
I am a civil engineer . I am also selected for sbi clerk interview which is to be held on 4th May2010 is there anybody resembling the same? what question can be asked and what should be the probable answers?
I was once rejected for US visa in early August. But now I'm going again for interview next week. What are the chances that I will faced the same VO????
What is the snap size in civil and how can we create it?
Form where IS456 is adopted in 1978?
How to arrive d*d/162 , for finding the kg per meter , wt of steel