Answer Posted / mohammed aijaz hussain
Purpose of binding wire in RCC is to keep the reinforcement
intact in its required position otherwise it is welded.
Is This Answer Correct ? | 5 Yes | 1 No |
Post New Answer View All Answers
Minimum and maximum size of the building components
asubmerged weir is one in which the water level on the down stream side of the weir is just at the crest level below the crest level above the crest level at stamp elevation as water surface on upstream
How to build the floor to ceiling bookcase?
what is the mix design for M:60 with micro silica andmetakaoline?
how calucate cement sand ratio for plstering
pls tell me about method of cutting length of ties column
How to arrive dry volume of concrete (1.52 to 1.57) ?
satart to end steps by step process of building construction...? i want to planning theme accuretly
What is the minimum size of the particles of silt soil?
How can calculate the requirement of steel bars of rcc slab for 1100 sq ft?
what is difference between NP2 NP3 NP4 CONCRETE HUME PIPES USED AT SITE
How to calculate brick work quantity?? Block work quantity??
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Design a cantilever type retaining wall to retain sand for 4m above the ground. The sand fall slopes at the rate of 1 vertical to 2 horizontal. The weight of sand is 18000 N/m3, the angle of repose being 30. The safe bearing capacity of the soil is 200 kn/m2 at 1/25m below the ground level. Use m 15 concrete mix.
How to calculate quantity of plum masonry in 1:3:7