How to calculate the amount of Brick,cement & sand required
for 1 cum of 230mm thick brick work with ratio 1:5 please
give me an answer with detailed step
Answer Posted / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Volume of Mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/6 X 0.35 = 0.058 cu.m. = 1.67 Bags
Sand required = 5/6 X 0.35 = 0.292 cu.m.
Bricks required = 500 Nos.
Is This Answer Correct ? | 64 Yes | 45 No |
Post New Answer View All Answers
How to build the floor to ceiling bookcase?
How much time Required for PPR pipe network testing
how gradation of aggregates effect on slump of fresh concrete?
how to calculate freeboard in under ground water tank and technical details
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
How to calculate the crank rod in slab
Advantage of Aluminum form work in terms of activities can be skip and cost too
What is a projection line?
what is the max. area can we apply the plate load test ?
how much cost of single coat 20mm thick plastering per sqre meter
3. What are the disadvantages of your present job, things you do not like about it?
How to Calculate Materials Required for PCC 1:4:8 for 1Cum & Brickwork 1:4 for 1Cum & Plastering 1:4 (15mm Thick) for 100Sqm & RCC 1:4:8 & 2mt ( L1=1mt & L2=1mt ) length of 12mm Steel bended in 90degrees what is the formula to calculate Weight & Actual Length ?
how calucate cement sand ratio for plstering
How many kilo-newtons equals 1000 kilogram?
List out some of the software program that can be useful for architect?