what"s the formula find the cement consumption for brick work
23 thick wall 1 m3?
Answer Posted / mohammed aijaz hussain
Volume of Dry Mortar = 35% of volume of Brickwork
Let the Cement Mortar Proportion be CM(1:4)
Volume of mortar required = 0.35 X 1 = 0.35 cu.m.
Cement required = 1/5 X 0.35 = 0.07 cu.m. = 2 bags
Sand required = 4/5 X 0.35 = 0.28 cu.m.
Is This Answer Correct ? | 46 Yes | 22 No |
Post New Answer View All Answers
How do you measure concrete?
Who built the sears tower?
Why reinforcement done in shorter span in two way slabs
How to fix toll charge for a particular vehicle at toll booths in a highway?
what is education Cess.
What is the use of water table & Kreb stone for drain
Dear Frds, How can i calculate the Steel for RCC Slab, Please provide one Example also, so that i can understand very well. Ex: Area: 1320.0 Sft.(44' X 30') Span: 15'(Default). Column Size: 9"X15"(6 No.s 12mm Rods) Please Provide Calculation Details. Thankyou. Satish
Differentiate first angle & third angle projection?
satart to end steps by step process of building construction...? i want to planning theme accuretly
how much percent are used 20mm,10mm?
How many Sft of Level Plaster per Kg
How to find permissible diagonal tensile stress in reinforced brick work
what is mc arther pile?
what is polity
For elevated service Reservoirs what will be the output of each skilled carpenter and bar bender.