Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...

Trapezoidal footing length = 2m , B=1.7m D=0.5m and d-
0.15m. Can anybody help and calculate quantity of concrete
by explaining all formulas involved.

Answer Posted / deepak

isolated and combined footing formula

Is This Answer Correct ?    3 Yes 13 No



Post New Answer       View All Answers


Please Help Members By Posting Answers For Below Questions

plz drive the formula d2/162.162 for the calculation of weight of steel bars????

38524


In how many types u can do POP on ceiling and walls(on which material or by using which material)? b) what is the difference between dry , oil bound, enamel, acrlyic type of painting? 2nd :- I have certain queries, please help to solve. a) length of pile bore is 4m.excavation quantity will be area * length where area will be pi/4 * dia*dia. Is this right? b) It is a single reamed pile of 300m dia and reamed dia is 750mm. can any body help me to calculate excavated quantity of this bulb(reamed section),, concrete quantity in bulb with showing the formulas to be used?

2162


what is the water cement ratio of 1:6 and 1:4 cement sand mortar. reply soon

2813


Why we provide hair pin for shed

2370


What is the name of this multiplication factors ?

2139


What is bylayer?

1159


Why Vitrified tile are getting pop up.

1042


Whats be the minimum foundation depth of multistoried building as per height of building in individual footing?

1879


What is the Hardness of M-40 grade concrete, general and theoratical

2130


Design a rectangular channel.

2918


what is the type of earthing

2233


what is castigliano theaorem

2273


what are RIB slabs explain about it

2649


I have a slab of 20cm thickness of 20m by 4m in wich we are installing 15 tons electric panels , and we have put 4 H-shaped columns under the slab but we have done many cores in the slab which seems very normal , can you help me by telling me how to calculate the bearing capacity of the slab or give me an idea if i should increase more columns Note: load distribution area 12*1.5 m2

2328


Why are steel plates inserted inside bearings in elastomeric bearings?

1175